- Can Digiwin ERP be connected to n8n?
- Usually, yes. If the ERP can be connected from the outside, allows database reads or exports a consistent file, n8n can link it without changing the ERP itself. The method depends on your Digiwin product, version and customizations, and we confirm it together in the free 30-minute consultation.
- Will this change our ERP?
- No changes are made to the ERP itself. Data is read through a read-only account or export files, and actions that write back, such as creating an order, can be set to wait for someone's approval. Every action is logged.
- Should we check with our Digiwin consultant first?
- We recommend involving them. Creating a read-only database account and confirming what can be written back usually needs approval and help from your in-house IT or Digiwin consultant. We prepare the questions so you can simply forward them.
- What can the reports look like?
- A Google Sheets table or a Looker Studio dashboard, following the format you build by hand today. Reports refresh on schedule, and missing or mismatched data is flagged separately.
- What happens if a sync fails?
- Key workflows retry automatically. If one still fails, the owner gets an email, LINE or Slack alert, and the failed record stays on a pending list so it can be fixed and rerun instead of disappearing.
- How long does it take to launch?
- A single workflow, such as a weekly operating report, usually takes 1–2 weeks. Cross-system sync of orders, inventory and shipping usually takes 3–6 weeks. Timing depends on the ERP version, how clean the data is and how many approval steps you want.